Building and Safety Division
The Building and Safety Division issues permits, provides plan check and inspection services, conducts code enforcement and provides assistance to citizens in complying with jurisdictional and State building codes to ensure the safety of the citizens of Moreno Valley.
News
Be Prepared - 2025 Building Codes Coming Soon!
On January 1, 2026, the 2025 California Building Code will become effective for all new permit applications as prescribed with adopted Ordinance No. 1033. See 2025 Year-End Submittal Bulletin...
New City Standard ADU Options Available
There are multiple plan options, each having 2 exterior design options to closely match your existing home, along with the choice of the base model or specific patio/porch options. See the options for City Standard and Custom-designed ADUs...
Heating and Cooling — Energy-Smart Choices to Help You
We have resources to help you with making informed decisions about updating your HVAC units (Heating/Ventilation/Air Conditioning).
Get Energy-smart Info...
Division Services
Welcome to SimpliCity
SimpliCITY is the City of Moreno Valley’s online plan review, permit, and inspection portal and is available 24/7. It makes the project permitting process simple and quick, without needing to drive to City Hall during business hours.
To access existing record status or information OR to start a new project, create a free SimpliCITY account first.
From Main Menu, select NEED HELP for Submittal Requirements, Video Tutorials, City Forms and Guidelines links, and more.
Accessory Dwelling Units
Get all the details about ADUs in one easy to use place. In our online guide you'll learn:
- What is allowed as an ADU, including Municipal Code references
- The different types of custon ADUS: detached, attached, converted space, and junior)\
- City-standard ADUs (detached only)
- Requirements for both types of plan submittal
- Things to consider before starting
- Being a landlord (ADU rentals)
- Frequently Asked Questions
- Additional Resources
Find it Fast
Here are direct links to resources for your building project.
View the next available inspection date and schedule an inspection:
See information about the overall permitting process from plan check to final inspection:
Review Building & Safety fee schedule to assist in planning your project.
Resources
Division Contacts View all
Main line: 951.413.3350
Inspection line: 951.413.3380
Fax line: 951.413.3363
Division email: building@moval.org
Inspection email: buildinginspections@moval.org


